Logo

1,145,000 عدادات الحواجز البحرية والعد Live يعيش

EcoCoast

Case Study: Emergency Dewatering at Louvre Abu Dhabi

Louvre Abu Dhabi sought a precautionary solution for containing sediment in case of emergency dewatering in a newly-flooded area. This area, initially reclaimed for construction, was to be excavated and flooded after completion.

To prevent sediment issues during emergency dewatering, we installed Ecobarrier Silt Curtains before flooding. This created a temporary moat around the reclaimed area, ensuring sediment containment while confirming zero leakage into the newly constructed buildings. Once approved, the bund was removed, and the flooded site integrated with the adjacent waterway.

We successfully supplied and installed 700 meters of Ecobarrier Silt Curtains, effectively containing sediment and preserving water quality during emergency dewatering at the Louvre Abu Dhabi construction site.

EcoCoast

EcoCoast دراسات حالة مماثلة

Img
Img

بادر بالاتصال بنا للحصول على حلول هندسية تدوم طويلاً! دعنا نناقش مشروعك، ونشكل معًا مستقبل الحماية والسلامة والأمن البحريين. نتطلع إلى تلقي ردك.