Logo

1,145,000 Meters OF MARINE BARRIERS AND COUNTING Live LIVE

EcoCoast

Case Study: Enhancing Coastal Navigation Along Mangrove Area

Addressing the challenge of developing a robust navigation aid for vessels navigating more than 1 nautical mile offshore in the harsh mangrove environment, ensuring visibility and durability.

We conducted a thorough design evaluation using our Moorforce software, leading to the selection of Ecobarrier Navigation Buoys (ENB-1500). Manufactured from UV-stabilized polyethylene, these buoys provide durability. With 420kg reserve buoyancy, 1.75m focal plane height and 2.25m² visible area, they ensure high visibility. Specialized anchor setups, verified by Moorforce, secured the buoys, and solar-powered Hyperion Marine Lanterns were installed for continuous nighttime visibility. Our team handled transportation, mobilization and installation, ensuring an efficient deployment.

The installed aids to navigation solutions effectively protect Kalba’s coastline, providing clear guidance for maritime passage. The buoys remain securely in place, maintaining visibility even at significant distances.

EcoCoast

EcoCoast Similar Case Studies

Img
Img

Contact us today for engineered solutions that last! Let's discuss your project, and together, shape the future of marine protection, safety and security. We look forward to hearing from you.